Short answer
The work on the roof usually takes a few days for a shingle or metal roof and one to two weeks for tile, depending on size and weather. The full process is longer because the permit, material orders and city inspections come first and in between.
A typical timeline:
- Estimate and contract — we measure, inspect and give a written price.
- Permit — we submit the HVHZ roofing permit with product NOAs. Review time depends on the city and how busy it is.
- Materials — most shingle, underlayment and flat-roof materials are in stock; some tile colors and Brava profiles need lead time.
- Tear-off and dry-in — old roof off, deck inspected and re-nailed, underlayment installed. Your home is protected from rain from here.
- Inspections and finish — city inspections at the required stages, then tile, shingles or metal, flashings and cleanup.
- Final inspection — the permit is closed and you get your paperwork.
Rain can pause work for a day here and there, which is normal in Miami. We'll give you a schedule at signing and keep you updated.